00 / BUILT ARCHITECTURE

Built With 3mm Stone.
Zero Structural Compromise.

Curved atriums, zero-demolition renovations, wet-zone thermal walls, and outdoor facades — documented with substrate specifications, panel yields, and adhesive data.

10 FT SEAMLESS PANEL HEIGHT
R150 MM TESTED CURVE RADIUS
ZERO SUBFRAME OR TEAR-OUT

01 / CASE ARCHIVE · 24MM ARCHITECTURAL RENDERS

Click any project to inspect substrate prep, panel yield & adhesive bill of materials.

MILAN, ITALY

SLT-01 Volcanic Black Basalt · 220 m² · Over Cast Concrete · 5 Days Dry Install

Double-height hospitality reception wrapped in split-face Volcanic Black Basalt divided by recessed champagne-brass vertical shadow reveals.

~68 SLABS · 660–990 KG ADHESIVE

GRAUBÜNDEN, SWITZERLAND

TRV-02 Wabi-Sabi Beige · 118 m² · Over Existing Ceramic Tile · 3 Days Dry Install

Seamless thermal bath walls clad directly over existing aged porcelain tile without jackhammering or compromising the underlying waterproof membrane.

~37 SLABS · 354–531 KG ADHESIVE

ZURICH, SWITZERLAND

MTL-02 Corten Desert Rust · 185 m² · Over Exterior Render · 6 Days Dry Install

Minimalist alpine pavilion exterior reclad in stabilized oxidized Corten stone panels above a dark Volcanic Basalt plinth — built for 30 freeze-thaw cycles down to -30°C.

~57 SLABS · 555–833 KG ADHESIVE

NEW YORK, USA

FL-01 Fluted Wave White · 32 m² · Over Painted Drywall · 2 Days Dry Install

A sculptural 3D fluted limestone hearth chimney wrapping effortlessly around a tight rounded architectural radius above a cantilevered travertine bench.

~10 SLABS · 96–144 KG ADHESIVE

NEW YORK, USA

MRB-01 Carrara Gold Marble · 96 m² · Over Gypsum Drywall · 3 Days Dry Install

Full-height 10ft bookmatched Carrara Gold dining gallery framed by recessed champagne-bronze shadow inlays — delivered up a standard residential elevator.

~30 SLABS · 288–432 KG ADHESIVE
SPECIFICATION DESK CUSTOM QUARRY & VOLUME

HAVE A PROJECT IN SPECIFICATION?

Send Your Elevation.
Get Direct Factory Yield.

Share wall dimensions or drawings for complimentary panel layout, substrate primer verification, and 3–4.5 kg/m² adhesive schedule within 2 hours.

CONFIGURE PROJECT BRIEF

02 / INSTALLATION SYSTEM

Inspect the 3-Layer Zero-Demolition Assembly.

Test compatibility across existing ceramic tile, drywall, and raw concrete — and calculate panel count and 3–4.5 kg/m² adhesive quantities live.

OPEN 3D EXPLODED ASSEMBLY & ESTIMATOR →

03 / FULL STONE LOOKBOOK

Request the Digital Catalog PDF.

Receive our complete architectural lookbook covering all 8 mineral texture families, standard formats (600×1200 to 1200×3000 mm), and Class A2 & CNAS lab documentation.

REQUEST DIGITAL CATALOG PDF →